Roberts Pizzarotti and Marques Formwork: Bigger Steps to Safety at North Shore Health Hub

During basement construction of the North Shore Health Hub in St Leonards, workers were installing steel reinforcing, which according to plans was to be placed 3.4m up from the floor. Steel fixers experienced a challenge with using standard equipment, as it meant ascending and descending frequently to move along the wall for drilling and installation. See what they did to solve it.

Sydney Metro Workers Go Overhead for Underground Station

Sydney Metro City and Southwest awarded John Holland CPB Ghella (JHCPBG) the contract to build the new 15.5 km twin tunnels from Chatswood to Sydenham. This includes the future Victoria Cross North Station on Miller Street in North Sydney. See how SafeSmart helped workers and heavy vehicles share the space.

A Bridge Over Doubled Water Crossing

At the Skeleton Creek segment of Melbourne’s Western Roads Upgrade Project in Truganina, civil contractor Winslow were experiencing a safety challenge for giving workers pedestrian access from one of side the creek to the other. The existing road bridge had no footpath and using the narrow road itself was perilous, with a constant flow of heavy haulage vehicles present. See what SafeSmart brought to the table.

Sydney Water Plant Gets the Proscaf Treatment

Sydney contractor Above All Solutions were commissioned to provide ways for maintenance people to access several points at a water treatment plant. In a plant like this, curved and angular concrete walls in spillways, tanks and around pipe infrastructure make height access very difficult, particularly due to a limited amount of suitable points for securing equipment. See how Proscaf solved it.

Formwork Deck Access Gets Lift at Macquarie Park

In what will be a higher-density zone, several architecturally-designed multi-level apartment buildings are taking shape. Of course, with multiple levels, challenges can become apparent for height access for workers.

SafeSmart Brings Sturdier Edge Protection to Tunnel Project

A major road tunnel infrastructure project in Sydney, that links points such as Chatswood to Sydenham and Sydenham to Bankstown, is well underway. At a major excavation point in the project, contractors were required to walk around the excavation close to the edge of a deep drop on a narrow area. Due to the depth of the drop, standard edge protection could not be used and still be compliant with AS regulations.

Getting the Concrete Over the Concrete, Safely

Being a high-rise development, concrete trucks are visiting this site all day, every day, as Icon pumps tens of thousands of litres of concrete on to the site, for backfilling and slab work.